Interactive lab · nothing is saved

Plan a fictional data centre.

Choose a workload, location and cooling approach. Then compare the energy, water and community trade-offs.

This is a guided comparison, not an engineering calculator or an assessment of a real development.

Rosie, a golden felt puppy, sniffs beside a cutaway felt model containing server racks, power equipment, cabling, fans and cooling pipes
Rosie inspects the physical systems behind “the cloud.” AI-assisted illustration; not a diagram of one real facility.

Data Centre Decision Lab

What would you need to know?

1 of 4

  1. 01 Workload
  2. 02 Place
  3. 03 Cooling
  4. 04 Resources

First decision

What must the service do?

Workload

The type of computing work changes what reliability, location and flexibility mean. It does not make the service automatically good or bad.

Choose a fictional workload